“construction is among the least digitized sectors in the world”
United States: second to last position
Europe: last position on the index
1% each year over the past 20 years for the construction industry*
vs
2.8% for the global economy as a whole
“98% of projects incur cost overruns or delays”
Average cost increase: 80%
Average delay: 20 months
Manage with Enhanced Predictive Analytics
Optimize Construction Schedules
Optimize Trades Sequencing
Identify Supply Chains Efficiencies
Manage Workforce Allocation
Manage the Pipe Fabrication Shop
Optimize Pipe Spool and Module Fabrication Sequencing
Optimize Pipe Fabrication and Installation Crews Allocation
What is the Optimal Mix of the Selected Types of Equipment to Complete the Scope in a Specific Time and at Minimum Cost?
What is the Minimum Time Required to Complete a Certain Scope with a Certain Equipment Mix?
What are Total and Unit Costs?
Which Type of Equipment is a Bottleneck?
Is any Type of Equipment Idling Too Much?
How will Scheduled Maintenance Affect my Productivity?
Set Benchmarks for Equipment Performance Under Various Construction Project Site Conditions
Validate and Update Construction Schedules
Optimize Resource Allocation
Identify Equipment Misuse
Identify Excessive Fuel and / or Oil Consumption
Identify and Resolve Bottlenecks
Reduce Overall Cost